RISK ASSESSMENT RECORD - WITH ALL CONTROL |
Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.
Director | Chris Waddington | |
Outdoor Filming Locations | - | Assessment Date: 4/1/12 |
HAZARDpotential for harm | Who might be harmed and how ? | PRECAUTIONS/CONTROLS already in place to remove hazard, reduce risk level | RISK (with controls) | ||
L | S | R | |||
Faulty/ broken equipment could cause electrocution. | Cast/Crew | Ask someone who is familiar with the equipment to check that it is in working order. | 1 | 2 | 3 |
Rain getting to equipment and causing electrocution to cast/crew. | Cast/Crew | Use something to cover the equipment or preferable avoid filming in this weather. | 2 | 2 | 4 |
Hit by a vehicle. | Cast/Crew Driver | Filming at none peak times and cross roads at designated crossing areas. | 1 | 3 | 4 |
Slipping on mud. | Cast/Crew | Wear shoes with grip and be cautious where walking. | 3 | 2 | 5 |
Attacked by animals. | Cast/Crew The animal | Stay in a group and avoid doing anything to provoke the animal. | 2 | 3 | 5 |
Tripping on cracked pavements, tree roots ect. | Cast/Crew | Be cautious where walking. | 2 | 1 | 3 |
Falling in ponds, rivers, lakes ect. | Cast/Crew | Keep a safe distance from these areas. | 1 | 2 | 3 |
Deadfall hitting cast/crew. | Cast/Crew | Keep a look out and be cautious. | 1 | 2 | 3 |
Attacked by people. | Cast/Crew Attacker | Stay in a group and avoid doing anything to promote violence. | 1 | 3 | 4 |
Lightning | Cast/Crew | Check the weather forecast and avoid filming if this weather is predicted. | 1 | 3 | 4 |
Rain | Cast/Crew | Check the weather forecast and avoid filming if this weather is predicted. | 2 | 2 | 4 |
Wind | Cast/Crew | Stay away from open areas in this weather and wear shoes grip. | 1 | 3 | 4 |
Hot Weather | Cast/Crew | Apply sun cream in this weather and drink plenty of fluids. | 1 | 2 | 3 |
Hail | Cast/Crew | Check the weather forecast and avoid filming if this weather is predicted. | 1 | 1 | 2 |
The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the following:-
(L) LIKELIHOOD 1. Hazard exists very infrequently; limited numbers exposed 2. Likely to occur; hazard exists intermittently or occurs occasionally 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed | (S) SEVERITY OF HAZARD 1. Could cause minor injury only 2. Could cause major injury/3 day or more absence 3. Could cause fatality/severe injury | (R) RISK LEVEL is product of Likelihood and Severity (LxS). Very high risks score 6 or 9 Moderate risks score 3 or 4 Low priority risks score 1 or 2 VERY HIGH RISKS NEED IMMEDIATE ACTION |
No comments:
Post a Comment